structural risk minimization (under construction)
Summary
-No Summary-
Notes
This concept is still under construction.
Context
This concept has the prerequisites:
- VC dimension (Structural risk minimization is based on a nested sequence of models of increasing VC dimension.)
See also
- Other methods for controlling overfitting include: